skip to Main Content
Resurfacing Work At Motoscope

Resurfacing Work At Motoscope

Over the past 9 months we have being carrying out some major work to both our building and yard area. We started work by preparing the yard for resurfacing by sorting out the drainage in both the front and rear yard space and also fitting new curbs around the area. We then installed and new roller shutter door to the front of the building to allow access to the newly installed 4 post ramp and tyre fitting facilities.

Today sees the start of the final stage, to tarmac the yard.

Resurfacing work roller shutter door

This Post Has 0 Comments

Leave a Reply

Back To Top